Applications:
First and second coats in a three-coat plasterboard jointing system – embedding tape, filling joints, and covering fastener heads.
Features:
- Setting-type (chemical setting) - hardens by chemical reaction, not air drying; fast, strong, low shrinkage.
- Superior tape adhesion - bonds tape firmly, prevents blistering and cracking.
- Powder form - mix with water on site to required consistency.
- Available in three working times - choose by project size and conditions.
- Compatible with hand and automatic tools - versatile application.
- NCC compliant - meets Australian building standards.
Sizes (Working Life):
Base Coat 45 - 45 minutes working time. For small jobs, fast-paced work, tight schedules.
Base Coat 60 - 60 minutes working time. For standard medium to large projects, most popular.
Base Coat 90 - 90 minutes working time. For large areas, slow-paced work, hot weather conditions.
Packaging: 20kg bags. Coverage: approx. 100m² per bag (first coat).